Blog - sustainable universal exchange

Rich vegetable Harvest

Rich vegetable Harvest

After some trials last year, a larger area was cultivated with eggplants this year. Next door are experimental fields where different types of mixed crops are cultivated in a concept reminiscent of a raised bed. The moisture-loving plants are at the bottom of the...

First Solar Panels working

First Solar Panels working

On 31 August, the first solar panels were put into operation on the roofs of the Academy and the boarding school buildings after the feed-in permit of the electricity grid operator had finally been received. Electricity prices in India are also soaring. Although there...

Solar Panels on Fathers’ Home

Solar Panels on Fathers’ Home

The first solar panels were installed on the roof of the old people's home at the beginning of February 2018. Among the visitors on the roof also our second chairman as well as the cash auditor, who were just in Kirpal Sagar for the annual planning. In a first...

“Indian Evening” in Waldkirchen

“Indian Evening” in Waldkirchen

More than 50 listeners came to the kick-off event of the annual program 2018 at 17:00 o'clock in the cultural center HNKKJ in Waldkirchen in the Bavarian forest under the motto "Indian evening - a somewhat different travel report" and was organized by KS-plus e.V.....

New Switching Panel arrived

New Switching Panel arrived

Preparations for photovoltaics are in full swing. Not only must the modules be anchored on the roofs, the electrical infrastructure must also be designed for this. New cables had to be laid in many places, and the switching technology also had to withstand the load....

Agricultural Trade Fair

Agricultural Trade Fair

In Kirpal Sagar, a trade fair with a series of lectures on the subject of sustainable agriculture took place in November, one highlight being the presentation by a top-class speaker from Austria who presented sustainable dairy farming. At home he runs an...

Kick Off: Photovoltaik

Kick Off: Photovoltaik

In November 2017, work began on the photovoltaic system on existing roofs. The first building to receive the panels is the old people's home, which is located near the transformer that converts the 11 kV of the high-voltage line into 440 V. The transformer will be...

Workshop Students save Lifes (Day 5)

Workshop Students save Lifes (Day 5)

03. November: At the debriefing in the management of the Academy we hand over the certificates of participation and receive letters of thanks, also for the home school. The first parents had already contacted the headmistress, whose children had enthusiastically told...

Recent Comments

    Categories